Fabric Stucloper wrapper for around datenklo's.

The dimensions of a portable toilet are: w=122 l=111 h=223 cm. As according to this Boels model: https://www.boels.com/nl-nl/huren/bio-box-mobiel-toilet/p/19002. According to NOC, about 50 datenklo's were used at SHA2017.

  • Assuming all sides are covered with 2m of cloth silver-coloured stucloper, we need 8m for each datenklo, with 50 datenklo's this is 400 meters in total.
  • If covering the door side causes access to be too hard, we can leave it uncovered and use 6m per datenklo. This leads to a total of 300 meters.
  • A budget option (and also simpler) is to just wrap three sides (side walls and back) in one horizontal strip of fabric silver-coloured stucloper, just below the ventilation holes. This costs only 3.5 meters of cloth silver-coloured stucloper per datenklo: 175 meters total.

The budget for this project is intended for everything but the fabric silver-coloured stucloper itself, like attachment materials.

Dependencies

  • Team NOC is needed to coordinate buildup and teardown. Holes in the sides of the datenklo's are used to pass cables through. The door should be accessible during the event.

Status

  • Do a test to see wether acrylic spray paint and stencils can be used to pretty the stucloper up.
  • TODO: Buildlog...

Howto: Prepare

  • TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
  • TODO: Do volunteers require a specific set of skills?
  • TODO: How many volunteers over how many hours are required?
  • TODO: Is the preparation bound to a specific location?
  • TODO: How much space is required to store the project before it is moved to the event site?

TODO: Describe the manufacturing process in the highest level of detail.

Howto: Buildup

  • TODO: Where is the stuff stored?
  • TODO: Should Team Logistics be involved in moving the project to the event site?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: How much waste in cubic meters is produced?