LennyFace

From MCH2022 wiki
Jump to navigation Jump to search
Project Name Lenny Face
Contact SA007
Status prototype
Budget 1500
Fabric Length (meter)


The TL Lenny Face was one of the most photographed objects at SHA2017. It was simple to realize and quite cheap. Let's see if it is feasible to repeat it for MCH.

Possible changes/improvements:

This project will feature 3x the scale of last time. Each unit consists of 3 fences with height extenders and diagonal back braces. Elongated light fixtures are attached to the fence (with tie wraps?) to form a "Lenny Face".


Dependencies

  • TODO: Other teams needed?
  • TODO: Permits required?
  • TODO: Power in watts?
  • TODO: Network? Private network required?

Status

  • SA007 has inventarised a list of TL lights left over from SHA2017:
    • 9x short
    • 12x long
    • 1x extra long (150cm)
  • 2022-03-15: Mailed Team:On-site_transportation for the Boels rental of 3 fences for lenny faces
  • 2022-05-09: ACK from Manduca about the fences, incl correction to 12 segments

TODO:

  • Decide on which faces to make
  • Get new weather proof lamps
  • Wire new lamps for outdoor deployment

Howto: Prepare

  • TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
  • TODO: Do volunteers require a specific set of skills?
  • TODO: How many volunteers over how many hours are required?
  • TODO: Is the preparation bound to a specific location?
  • TODO: How much space is required to store the project before it is moved to the event site?

TODO: Describe the manufacturing process in the highest level of detail.

Howto: Buildup

  • Scaffolding needs to be assembled
  • An print is provided with how to place the lamps on the scaffolding
  • 2 people per unit
  • TODO: Where is the stuff stored?
  • TODO: Should Team Logistics be involved in moving the project to the event site?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: How much waste in cubic meters is produced?